CONST.OF 02 MWHPP SERMIK PR-IV OF PENSTOCK PIPE 109 ACCESSORES&ALLIED CIVIL WORKS
COMPLETED
2
CONST OF 1.5MWHPP AT 668 LE L107S1 F1O90 / 61 DUMSUM PH-1(S / F OF MS PENSTOCK PIPE AND ANCHOR BLOCK
COMPLETED
3
CONST OF 04 MINI CAPACITY 0.8 MWIN GULTARI AREAS(S / F OF MS PENSTOCK PIPE AND ANCHOR BLOCK)
COMPLETED
4
IMP / WIDENING&METALLING OF ROAD FROM ASTORE BAZAR TO RAMA PTDC TOURIST RESORT AT ASTORE (9km)
COMPLETED
5
METALLING OFROADIFROM CHILIM TO SHER KULI ASTORE 06KM
COMPLETED
6
METALLING OFROAD FROM CHILIM TO SARDAR KIOTI 10 KM
COMPLETED
7
CONST OF 03 MW1IYDEL PROJECT ATPARASHING ASTORE.02 MWHYDEL PROJECT PHASE-1(S / F)OF TRANSMISSION LINE UPTO BUNJI)
COMPLETED
8
METALLING OF ROAD FROM DUMSUM TO GOMA(PORTION- ID(04 KM)
COMPLETED
9
GENERATION OF ELECTRICITY IN HALQA-I SKARDU、(T / D LINES)
COMPLETED
10
CONST OF 01 MW HYDEL PROJECT GINYAL / MATYAL SHINGO SHIGAR(T / D LINE)
COMPLETED
11
IMP OF T / D LINES IN HALQA-I / 1Z ASTORE
COMPLETED
12
RESTORATION OF T / D LINES AT HALQA-I&II AT DISTRICT ASTORE
COMPLETED
13
T / D LINE AND TRANSFORMERS IN GULTARI
COMPLETED
14
CONST OF 01 MW HPP AT KENDERIK T / D LINES
COMPLETED
15
RE-CARPETING OF ROAD KHAPLU TO GHOWARI RE-CARPETING OF EXISTING METALED SUFACE BARAS PARI TO KHARFAQ I / C METALLING OF ADDITIONAL 4ft SHARP BENDS(PORTION-I
COMPLETED
PROJECT DETAILS (MES)
S.no
PROJECT DETAILS (MES)
COMPLETION
1
Provn of Gas Detector Sys in A&E, Mental Health, Inpatient, AM Block, Opthomology, Offrs Family Block & OPD at MH Rwp
COMPLETED
2
Anti Bacterial Pint Of OTs And ICU at CMH Rwp
COMPLETED
3
Repair / Renov of Complete Drainage Line of OT Complex At CMH Rwp
COMPLETED
4
Provn of Hard Standing Road, Boundary Wall and Drain in Front Of Kitchen at CMH Rwp
COMPLETED
5
Provn of Gas Detector Sys in Svc for Svc Block, OPD, A&E, Sldr, Offrs, Gynee & Paeds Blocks, BMTC Bldg, & Pathology Dept at CMH Rwp.
COMPLETED
6
Provn Of Fire Suppression System of A & E, Radiology, Inpatient, Offr Block, Medical Complax-I & OPD at MH Rwp
COMPLETED
7
Up- Gradation Of Fire Fighting & Fire Alarm System at MH Rwp.
COMPLETED
8
Repair / Maint Work of Misc Bldgs at PEMH Rwp.
COMPLETED
9
Up- Gradtion Of Bldg NO-55at CMH Rwp
COMPLETED
10
Extn of Surg HDU ? ICU-II at CMH Rwp.
COMPLETED
11
Supply and Instl of Fire Fighting , Fire Alarm , Nurse Call Sys, and intr Elec Accessories for AM Block-I at PEMH Rwp